期刊文献+

斜拉-悬吊协作体系的设计探索 被引量:37

RESEARCH ON THE DESIGN OF CABLE - STAYED SUSPENSION BRIDGES
原文传递
导出
摘要 中国21世纪的跨海工程将面临软土地基、强台风、深水基础等条件,仅用悬索桥和斜拉桥作为大跨桥型,已不能满足工程需求。作者建议采用斜拉-悬吊协作体系以及多跨索支承组合体系来取长补短,弥补体系之不足。本文以伶仃洋大桥工程为背景,探索了1400m伶仃东航道斜拉-悬吊协作体系的设计,为这种桥型的设计和跨世纪、跨海大桥方案研究提供参考依据。 The 21st century project of a strait crossing is faced with much natural conditions such as the soft foundation, the violent typhoon, and the deep - watered foundation. Only to take a suspension bridge or a cable-stayed bridge as a long- span bridge type is not satisfied with the engineering requirements. The cable - stayed suspension bridge and multi - span cable - supported combined system can make up the deficiencies. A design of the cable - stayed suspension bridge of 1400 meters is Proposed in the paper. It is assumed locating on the east channel of the Lingding strait.
机构地区 同济大学
出处 《土木工程学报》 EI CSCD 北大核心 2000年第5期46-51,共6页 China Civil Engineering Journal
基金 国家自然科学基金!(批准号:59895410)
关键词 悬索桥 斜拉桥 斜拉-悬吊协作体系 设计 suspension bridge, cable - stayed bridge, cable - stayed suspension combined system
  • 相关文献

参考文献1

二级参考文献3

共引文献14

同被引文献198

引证文献37

二级引证文献157

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部