摘要
Considering the actual operating experience of the Daode Wind Farm, this paper analyzes the rea-sons for the fault of the lO-kV switch cabinet. Some technical improvements and management measures, such as implementing the anti-accident technical measures, improving the installation and debugging level, and strengthening operation inspection, are proposed.
Considering the actual operating experience of the Daode Wind Farm, this paper analyzes the reasons for the fault of the 10-kV switch cabinet. Some technical improvements and management measures, such as implementing the anti-accident technical measures, improving the installation and debugging level, and strengthening operation inspection, are proposed.