摘要
根据天津分公司目前蒸汽负荷需求及机炉装置运行情况,提出机组改造方案,并对装置改造后蒸汽平衡进行预测及效益分析,比选出最佳改造方案。
According to current steam demand and boiler-turbine operation in Tianjin Petrochemical Company, the article puts forward unit revamping scheme, and analyzes the steam balance after revamping. Through analysis and comparison of the benefit, the optimum revamping scheme is identified.
关键词
蒸汽平衡
机组改造
效益分析
steam balance
steam turbine transformation
cost-benefit analysis