摘要
简述主蒸汽管弯管的蠕变测点安装方法与监测结果 ,为主蒸汽管弯管的金属技术监督和弯管的寿命管理提供了依据。
出处
《东北电力技术》
2000年第7期15-16,25,共3页
Northeast Electric Power Technology
同被引文献5
-
1H. J. M. Hulshof. Optical strain measurement SPICA JR l, KEMA report 51M90-KIM 93 -3251, Amhem, the Nether- lands, 1993.
-
2H. J. M. Hulshof, P. G. M. Welberg, L. E. de Bmijn. More plant availability by local and integral strain measurement [J] , VGB Power Tech 10J2002, pp. 114-116, 2002.
-
3H. J. M. Hulshof, J. W. Noteboom, P. G. M. Welberg, L. E. de Bruijn. Improved plant availability by advanced con- dition based inspections [R], Institute of Materials Engineering Australasia Ltd. , Operatinlg Pressure Equipment 7.
-
4H. J. M. Halshof. Experiees with SPICA and strain sensors [ C ] , Creep strain measurement workshop, RWE, Essen Ger- many, 17 April, 2007.
-
5张艳红,李宏强,徐昀.P91钢主蒸汽管道焊缝金相缺陷形态及其形成原因探讨[J].东北电力技术,2009,30(7):1-5. 被引量:9
二级引证文献7
-
1燕洪明,裴海峰.3号汽轮机转子轴向定位引出值变化原因分析[J].东北电力技术,2014,35(3):41-43. 被引量:2
-
2王伟,周荣灿,钟万里,唐丽英,李文胜,李季.高铬马氏体耐热钢蠕变损伤评估技术研究进展[J].热力发电,2016,45(5):1-8. 被引量:1
-
3吉建兵.火力发电厂几种高温承压金属部件损伤分析及处理[J].东北电力技术,2021,42(3):59-62. 被引量:3
-
4吉建兵,陈明.600 MW机组高调门后导汽管泄漏原因分析及处理[J].东北电力技术,2023,44(5):42-46.
-
5赵东亮.俄制汽轮机通流改造后首次大修典型缺陷分析与处理[J].东北电力技术,2023,44(11):39-42.
-
6白占桥,张英伟,白建强,赵扶起,王鹏,郭德瑞,图嘎,陈鑫.调峰机组高温管道应力测试方法与数据分析[J].电力学报,2023,38(6):515-524.
-
7程欣.沈阳热电厂3号机组主蒸汽管道安全性分析[J].东北电力技术,2016,37(1):50-52.
-
1苏蔚,王怀席,于学峰.主蒸汽管弯管蠕变测点安装与监测[J].理化检验(物理分册),2001,37(4):155-158. 被引量:3
-
2刘引,李承业.测量锅炉管壁温度方法[J].电站系统工程,2005,21(3):60-60. 被引量:6
-
3叶建华.高温高压蒸汽管道蠕变测点的装设[J].安装,1995(4):10-11.
-
4杨朝阳.蒸汽管道蠕变的检查方法及应用[J].石油和化工设备,2010,13(9):39-41. 被引量:2
-
5袁重.1999年金属技术监督工作总结[J].湖北电力技术监督,2000,12(2):18-23.
-
6闫侯霞,刘晓.浅谈火电站生产阶段金属技术监督[J].硅谷,2011,4(5):130-130. 被引量:1
-
7卢方龙,杨点中,王美秀,徐贤.有关主蒸汽管弯管应力的几点看法[J].宁夏电力,1999(3):30-32.
-
8纪贵友.12Cr1MoV管的焊接[J].焊接技术,1997(5):42-43.
-
9沈鸿声,段旭珍,印建平,高伟健.12Cr1MoV钢蒸汽管运行后金属中合金元素的晶界偏聚[J].热力发电,1991,20(5):9-20.
-
10袁重.金属技术监督(2000年3季度季报)[J].湖北电力技术监督,2000,12(6):9-9.