毛尔盖水电站库尾红岩滑坡稳定性分析与治理措施 被引量:2

Analysis on Stability of Redstone Landslide in Reservoir Tail Area at Maoergai Hydropower Station and the Countermeasures
在线阅读 下载PDF
导出
摘要 针对毛尔盖水电站库尾移民安置点后缘红岩滑坡,分析其形成机理;在考虑天然、暴雨、地震工况条件下,以传递系数法分析红岩滑坡的稳定性,采用STAB2009程序对采取减载后红岩滑坡的稳定性进行了分析,并提出了红岩滑坡设计方案与治理措施。 In relation to the redstone landslide at the back of resettlement region in reservoir tail area at Maoergai Hydropower Station, the formation mechanism thereof is studied. Taking the conditions of nature, rainstorm and earthquake into consideration, the landslide stability is analyzed by means of transfer coefficientand, with STAB2009 program, the stability on conditions of deloading is analyzed. In addition, the design scheme and the treatment measures are proposed as well.
出处 《路基工程》 2013年第3期174-179,185,共7页 Subgrade Engineering
关键词 滑坡 稳定性分析 治理措施 landslide stability analysis treatment measures
  • 相关文献

参考文献7

二级参考文献26

共引文献189

同被引文献22

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部