期刊文献+

石梁河水库泄洪闸闸下冲刷试验研究 被引量:8

Test of Scour under Sluice Gates of Shilianghe Reservoir
在线阅读 下载PDF
导出
摘要 通过局部动床模型试验 ,研究了石梁河水库新老泄洪闸闸下河床冲刷特性 ,分析了枢纽运行方式、出池水流的流速流态等因素对闸下冲刷的影响 。 Through local dynamic bed model test,the scour characteristics are studied of river bed under the new and old sluice gates of Shilianghe Reservoir;main factors are analyzed such as the operation mode of the project that influence the scour under the sluice gats;reasonable scour lessening mode of united operation of the new and lod sluice gates is suggested;and efficient engineering measurements are proposed for lessening scour,such as distorting side wall in the stilling basin and baffle blocks of horseshoe shape on the secondary dropoff.
作者 周春天 宁勇
出处 《河海大学学报(自然科学版)》 CAS CSCD 2000年第2期113-116,共4页 Journal of Hohai University(Natural Sciences)
关键词 消力池 冲坑形态 河床冲刷 泄洪闸 闸下冲刷 stilling basin apron scour pit shape operation mode
  • 相关文献

参考文献1

  • 1左东启,模型试验的理论和方法,1984年,114页

同被引文献56

引证文献8

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部