摘要
江苏金港湾国际物流园区建于连云港市沿海的深层软土上。"8 m高强度超载预压联合强夯"方案被首次采用对B型集装箱堆场进行软基处理,并获得成功,大大突破了本地区以往的超载预压高度。该工程案例不仅为连云港市的高强度软基处理提供了成熟经验,而且证明了高强度软基处理具有可行性和可操作性,对在沿海软土上修建港区具有良好的借鉴作用。
Jiangsu Jingangwan international logistics park is constructed in Lianyungang coastal deep soft soil, "8 m high-strength overload preloading combined dynamic compaction" scheme is first used successfully on container yard B for soft foundation treatment, which broke through significantly the overloading prepressing height in the local area before. The engineering case not only serves successful experience for the high-strength soft foun- dation treatment in Lianyungang city, but also verifies the feasibility of the high- strength soft foundation treatment. It may serve as reference for the construction of port area on coastal soft soil ground.
出处
《水运工程》
北大核心
2013年第5期162-167,共6页
Port & Waterway Engineering
基金
江苏省建设厅基金项目(JS2008ZD03)
关键词
高强度超载预压
联合强夯
软基处理技术
现场试验
high-strength overload preloading
combined dynamic compaction
soft foundation treatment technology
field test