期刊文献+

涠洲终端开闭排取代污泥沉淀池改造设计

The Modification Design of the Open and Close Drain Replacing the Sludge Sedimentation Tank of Weizhou Terminal
在线阅读 下载PDF
导出
摘要 涠洲终端设备的含油污水都直接排往污泥沉淀池,进行预处理后,然后分离出来的油进入污油罐,水进入污水处理系统,污泥进入污泥沉淀罐进行后续的处理。污泥沉淀池为敞开式的,由设备过来的不少带压含油污水携带不少气体,进入污泥沉淀池后气体冒出来混入大气中存在安全隐患。本项目提出通过增加一个闭排罐和开排罐来解决相关问题。该技术已在涠洲终端中成功应用,为终端的安全生产和操作人员提供安全保障,为今后石油石化终端的安全生产,提供技术参考。 The oily sewage of Weizhou terminal equipment is directly discharged into sludge tank.After pretreating, the separated oil enters into the sewage tank, water enters the sewage treatment system, and sludge into sludge tank for subsequent processing. Sludge sedimentation tank is open.Some of pressuring oily sewage from the device carry gas,which ebter into the Sludge .sedimentation tank. The gas mixes with air,that is potential safety hazards.This project adds a close tank and a open tank to solve related problems. The technique has been successfully applied in Weizhou terminal, provides security for terminal safety production and personnel operation, and technical reference for petrochemical terminal safety production in the future.
作者 黄振东
出处 《浙江化工》 CAS 2013年第4期34-36,共3页 Zhejiang Chemical Industry
关键词 涠洲终端 污泥 沉淀池 开闭排 Weizhou terminal sludge sedimentation tank open and close drain
  • 相关文献

参考文献6

二级参考文献27

  • 1王圃,龙腾锐,李江涛,陆柯,雷刚.城市给水厂污泥处理与能耗[J].重庆建筑大学学报,2005,27(4):77-80. 被引量:31
  • 2蒋卫刚,顾国维,俞国平.二沉池动态仿真模型研究[J].环境工程学报,2007,1(3):21-24. 被引量:8
  • 3张代钧,李振亮,卢培利,张天,庞子山.活性污泥过程反应池与二沉池耦合模型与模拟[J].中国环境科学,2007,27(2):155-159. 被引量:4
  • 4松罔元.土力学[M].罗汀,姚仰平,译.北京:中国水利水电出版社,2001.
  • 5崔和平,彭永臻,周利,高春娣,付振强.关于污泥膨胀研究的现状与展望[J].哈尔滨建筑大学学报,1997,30(3):113-116. 被引量:15
  • 6钱宁.高含砂水流运动[M].北京:清华大学出版社,1989.
  • 7Ekama G A, Barnard J L, Gunthert F W, et al. Secondary settling tanks:Theory, modeling, design and operation [R]. London: IAWQ, 1997.
  • 8Couillard Do Zhu S C. Control strategy for the activated sludge under shock loading [J]. Water Res., 1992,26(5):649-655.
  • 9Muller J R, Krauth K. Wastewater flow management to maximise the capacity of sewage treatment plants [J]. Water Sci. Technol., 1998, 37(9):49-56.
  • 10Vanderhasselt A, Aspegren H, Vanrolleghem P A, et al. Settling characterisation using on-line sensors at a full-scale wastewater treatment plant [J]. Water S A, 1999,25(4): 1-6.

共引文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部