预制静压桩 ,压桩完毕后常见桩顶上抬的普遍现象 ,造成基桩承受荷载后有较大的沉降差异。本文分析了抬桩原因 ,建议用复打方法解决。
Uplift of pile top after the installation of a prefabricated silent pile is commonly occurred.It will cause greater settlement of the pile foundation when it is loaded.In this paper,the reason of uplift is analysed and re hammering is suggested as a remedy.
出处
《土工基础》
2000年第3期47-48,54,共3页
Soil Engineering and Foundation
关键词
抬桩
复打
预制静压桩
施工
uplift of pile top,re hammering,prefabricated silent pile