浅埋超近距离交叉隧道施工顺序数值模拟研究 被引量:2

Digital Simulation Study on Construction Order for Shallow Buried Interchange Tunnel
在线阅读 下载PDF
导出
摘要 以长沙西北下行联络线罗家一号隧道下穿新建杭长正线曾家岭一号隧道为工程背景,运用数值分析手段对浅埋条件下超近距离立体交叉隧道的施工顺序进行了详细分析。通过不同计算工况下围岩和衬砌结构位移场、应力场以及围岩塑性区的对比分析,得到"先下后上(先施工下洞后施工上洞)"的施工顺序明显优于"先上后下(先施工上洞后施工下洞)"的施工顺序。最后将该研究成果应用于工程实践指导施工,目前该工程已经顺利竣工,说明该文提出的施工顺序是可行的,安全可靠的。 Based on the project of Luojia tunnel 1 to Zengjialing tunnel 1 in Northwestern Changsha, construction order for shallow buried interchange tunnels with extra close distance is analyzed in detail. Through the comparison and analysis on the surrounding rock, displacement field of lining struc- ture, stress field and plastic zone of surrounding rock, it is known that construction order of" down first, up second" is superior than that of" up first, down second". The study result is applied to guide the construction and achieve the final goal. It is proved that the construction order presented is feasible and reliable.
作者 李存军
出处 《重庆建筑》 2013年第5期35-38,共4页 Chongqing Architecture
关键词 浅埋隧道 超近距离 立体交叉隧道 施工顺序 数值模拟 全断面无支护开挖 台阶法加支护开挖 shallow buried tunnel extra close distance interchange tunnel construction order digital simulation whole section excavation without support step excavation with support
  • 相关文献

参考文献2

二级参考文献8

共引文献5

同被引文献11

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部