摘要
铜街子水电站是我国最早采用碾压混凝土筑坝技术的大型电站。是国家“七、五”计划的科研项目。本文着重论述了针对碾压混凝土筑坝技术的原型监测设计准则,论述了仪器布置及埋设技术的研究应用。并通过对已经取得的部分观测资料的整理分析,说明了仪器布置是合理的。仪器埋设技术是成功的。
Tongjiezi Hydroelectric Project, a large and the first hydropower station constructed by employing the technology of roller compacted concrete is a project for scientific research in the 'Seventh Five-Year Plan'. This paper places emphasis on setting forth the design criterion for prototype monitoring of roller compacted concrete and discusses the arrangement and embedding technique of monitoring instruments. By processing and analyzing some recorded data, it demonstrates that the instrument arrangement is reasonable and the embedding technique used is successful.
出处
《大坝观测与土工测试》
北大核心
1991年第2期23-29,共7页
Dam Observation and Geotechnical Tests