摘要
本文笔者论述了舜山隧道工程的基本概况,并通过开挖方法的确定和施工应力应变计算的分析,确定现场的监测方法应和变监测系统的设立,从而控制数据的确定与处理。
The author of this article discusses the basic situateion of the shun mountain tunnel project, and through the excavation method to determine and the analysis of the stress and strain calculation in construction, determines the monitoring methods should change the establishment of monitoring system, so as to control data set and processing.
出处
《城市建筑》
2012年第11X期75-76,共2页
Urbanism and Architecture
关键词
围岩分级
支护
应力应变
施工监控
隧道施工
动态管理
surrounding rock classification
support
stress and strain
construction monitoring
tunnel construction
dynamic management