牛头山黄土隧道的施工安全评价

Construction Safety Assessment of Loess Tunnel in Niutou Hill
在线阅读 下载PDF
导出
摘要 为了研究牛头山黄土隧道施工过程的安全性,借助于ANSYS软件和强度折减法,采用上下台阶法,对牛头山黄土隧道的施工过程进行了数值仿真,得出了该黄土隧道的施工安全系数,分析了施工过程中围岩的塑性区分布.结果表明该黄土隧道的围岩塑性区主要分布在隧道曲墙两侧附近,施工安全系数为1.873,符合工程质量要求,从而定量评价了牛头山黄土隧道的施工安全性,为保证牛头山黄土隧道的正常施工提供了参考. In order to study the safety of the construction process about loess tunnel in Niutou hill, with the AN- SYS software and the shear strength reduction method, using the up and down step method, the construction process of the loess tunnel in Niutou hill is simulated, and the construction safety factor to the loess tunnel is ob- tained and the plastic zone of the soil surrounding tunnel is analyzed in the construction process. The result shows that the plastic zone of the loess tunnel is mainly located at both sides of the curved wall of the tunnel, and the construction safety factor is 1. 873, which meets with the project quality requirements. Thus the construction safety of loess tunnel in Niutou hill is evaluated quantitatively , and a reference is provided for normal construc-tion of loess tunnel in Niutou hill.
出处 《兰州工业高等专科学校学报》 2013年第2期49-53,共5页 Journal of Lanzhou Higher Polytechnical College
关键词 牛头山 黄土隧道 上下台阶法 数值仿真 Niutou hill loess tunnel up and down step method numerical simulation
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部