期刊文献+

考虑桥梁几何非线性的风-车-桥耦合振动分析 被引量:16

COUPLING VIBRATION ANALYSIS OF WIND-TRAIN-BRIDGE SYSTEM CONSIDERING GEOMETRIC NONLINEARITY OF BRIDGE
原文传递
导出
摘要 考虑桥梁结构的几何非线性因素,建立了风及列车荷载作用下大跨度桥梁的振动分析模型。以某大跨度三拱连续钢桁梁桥为例,分析了脉动风及静风荷载的不同作用效应,风速、车速变化以及结构几何非线性对桥梁振动响应的影响。结果表明:在进行车桥耦合振动分析时要综合考虑风荷载的动力作用;几何非线性因素会影响桥梁振动的极值,但不影响其变化趋势;风速及车速变化对桥梁位移极值均有较大影响。 Taking into account the geometric nonlinearity of structures,the dynamic analysis model for long-span bridges under train and wind actions is established.A long-span continuous steel trussed bridge is taken as an example to analyze the load effects of static wind and buffeting wind,the influence of wind velocity and train speed and the effect of geometric nonlinearity.The results show that the wind loads should be considered in analyzing the train and bridge system;the geometric nonlinearity affects greatly the maximum deflections of bridge,but it does not change the tendency of displacement histories;both wind velocity and train-speed have great influence on the maximum deflection of the bridge.
出处 《工程力学》 EI CSCD 北大核心 2013年第4期122-128,共7页 Engineering Mechanics
基金 国家自然科学基金项目(50838006 51078029)
关键词 桥梁 列车 几何非线性 耦合振动 bridge train wind geometric nonlinearity coupling vibration
  • 相关文献

参考文献9

  • 1Guo Weiwei,Xia He,Xu Youlin.Running safety analysis of a train on the Tsing Ma Bridge under turbulent winds[J].Earthquake Engineering and Engineering Vibration,2010,9(3):307-318. 被引量:11
  • 2Kwon S D,Lee J S,Moon J W,Kim M Y.Dynamicinteraction analysis of urban transit maglev vehicle andguideway suspension bridge subjected to gusty wind[J].Engineering Structures,2008,30(12):3445-3456.
  • 3Xu Youlin,Zhang Nan,Xia He.Vibration of coupledtrain and cable-stayed bridge systems in cross wind[J].Engineering Structures,2004,26:1389-1406.
  • 4Zhang Xinjun,Xiang Haifan,Sun Bingnan.Nonlinearaerostatic and aerodynamic analysis of long-spansuspension bridges considering wind-stuctur interacions[J].Journal of Wind Engineering and IndustrialAerodynamics,2002,90(9):1065-1080.
  • 5Yang Y B.Wind-induced aerostatic instability ofcable-supported bridges by a two-stage geometricnonlinear analysis[J].Interaction and MultiscaleMechanics,2008,1(3):381-396.
  • 6王贵春,潘家英,张欣.大跨度铁路斜拉桥车桥耦合振动非线性分析[J].应用力学学报,2008,25(3):524-528. 被引量:15
  • 7Li Yongle,Qiang Shizhong,Liao Haili,Xu Y-L.Dynamics of wind-rail vehicle-bridge systems[J].Journal of Wind Engineering and Industral Aerodynamics,2005,93(6):483-507.
  • 8Cao Yinghong,Xiang Haifan,Zhou Ying.Simulation ofstochastic wind velocity field on long-span bridges[J].Journal of Engineering Mechanics,ASCE,2000,126(1):1-6.
  • 9张楠,夏禾,郭薇薇,夏超逸.京沪高速铁路南京大胜关长江大桥风—车—桥耦合振动分析[J].中国铁道科学,2009,30(1):41-48. 被引量:35

二级参考文献41

共引文献54

同被引文献156

引证文献16

二级引证文献193

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部