4Kuwahara E, Kawamura T, Yamazaki M. Shorting the defrost time on a heat-pump air conditioner[J].ASHRAE Transaction, 1985,91 :20-29.
5O'Neal D L, Peterson K T, Anand N K, et al. Refrigeration system dynamics during the reverse cycle defrost[J]. ASHRAE Transaction, 1989,95: 689-698.
6Nutter DW, O'Neal D L, Payne W V. Impact of the suction line accumulator on the frost/defrost performance of an air-source heat pump with a scroll compressor[J]. ASHRAE Transaction, 1993,99:689-698.
7O' Neal D L, Peterson K T, Anand N K. Effect of short-tube orifice size on the performance of an air source heat pump during the reverse-cycle defrost [J].Int J Refrig, 1991,14(7). 52-57.
8A1- Mutawa, Nawaf K. Sherif, S A. Analytical model for hot -gas defrosting a cylindrical coil cooler: Part Ⅱ - model results and conchusions [C] .ASHRAE Tranactions. v 104 n Pt 1B 1996. ASHRAE, Atlanta, GA, USA.
9A1- Mutawa, Nawaf K. Sherif, S A. Analytical model for hotgas defrosting of a cylindrical coil cooler: PartI - model development [C]. ASHRAE Transactions. v 104 n Pt 1B 1998.ASHRAE, Atlanta, GA, USA.
10Strong, Arthur P. Hot gas defrost of industrial refrigeration[J]. Heating, Piping & Air Conditioning. v 60 n 7 Jul 1998.