介绍澜沧江小湾水电站顶盖取水试验,并对试验情况进行一定研究分析,供相关人员参考。
A brief introduction to the experiment of getting unit cooling water from turbine head cover in Xiaowan hydropower plant was presented. Several important findings are achieved based on the analysis of the results of the experiment.