期刊文献+

应用水工补偿收缩混凝土快速施工的设计论证

Design Argument of Fast Construction Applying Hydraulic Shrinkage-Compensating Concrete
在线阅读 下载PDF
导出
摘要 本文结合某电站上游围堰,对水工补偿收缩砼快速施工进行设计论证。内容主要包括:补偿收缩砼围堰的分缝分块,膨胀预压应力与堰体温度应力,缝面张开度的计算和防裂作用的分析,以及水工补偿收缩砼性能试验与对比选择。 This paper puts forward the design argument of the scheme of fast construction applying hydraulic shrinkage-compensating concrete for the upper coffer-wall of a station. In the paper, dealt with are mainly the following- the blocking of concrete placement of the coffer-wall, expanding prepressing stress and coffer-wall temperature stress, calculation of the opening of joints and the analysis of crack-resisting effect and the performance test and contrast choice of hydraulic shrinkage-compensating concrete.
出处 《长江科学院院报》 CSCD 北大核心 1991年第4期18-26,34,共10页 Journal of Changjiang River Scientific Research Institute
关键词 水工混凝土 施工 补偿收缩 设计 shrinkage-compensating concrete self-volumetric deformation prepressing stress temperature stress sudden drop of air temperature
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部