盾构隧道下穿人行天桥桩基处理技术 被引量:4

Pile Foundation Treatment Technology of Shield Tunnel beneath Footbridge
在线阅读 下载PDF
导出
摘要 武汉轨道交通4号线某区间盾构隧道穿越人行天桥桩基。在盾构穿越天桥前,必须清除隧道开挖范围内的桩基。在无交通疏解和工期紧的条件下,首先搭设临时支架保护天桥,从地面注浆加固土体,在托换承台后,人工挖竖井从竖井中凿除盾构隧道范围内桩基,同时盾构穿越时调整施工参数。整个施工过程中,天桥正常通行,盾构穿越天桥后,承台最大累计沉降在3mm以内,保证了天桥的安全和盾构施工工期,到达了预期效果。 Line 4 of Wuhan urban rail transit uses shield tunneling across the pedestrian bridge with pile foundation. Before the shielding crossing the footbridge, piles within tunnel excavation region must be cleared. Under heavy traffic without diversion and with a fight project schedule, temporary support to protect the footbridge is erected, with grouting reinforcing soil from the ground. ARer supporting and changing the abutment, manual shaft dug from the existing shaft to remove pile foundation in the shield tunnel. At the same time shield adjusts construction parameters while tunneling. Throughout the construction process, the footbridge functions as normal passage. After shield crosses the footbridge, the maximum cumulative settlement of the abutment is less than 3 ram, the footbridge safety and shield construction period are ensured, reaching the expected results.
作者 张火军
出处 《现代城市轨道交通》 2013年第2期42-44,共3页 Modern Urban Transit
关键词 地铁 盾构 隧道 下穿 天桥 桩基 处理 技术 metro, shield, tunnel, underpass, footbridge, pile foundation, treatment, technology
  • 相关文献

参考文献4

二级参考文献11

共引文献43

同被引文献24

引证文献4

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部