摘要
通过对广州地铁二号线海珠广场站基坑施工过程中地表沉降、墙体位移等监测数据的分析和研究,得出了较为可靠的结论,总结出的经验和提出的建议可供类似工程参考。
Based on the supervising data which shows the ground settlement and wall movement from the pit supervision in metro station of Haizhu Square of No. 2 line of Guangzhou metro, it primarily sums up some experience and puts forwards the suggestion.
出处
《世界隧道》
2000年第5期23-27,22,共6页
关键词
地铁车站
基坑施工
施工监测
数据分析
Metro Station
Pit Construction
Analysis of Supervision Data