通过介绍国际高层建筑项目的预应力现浇板的施工工艺,包括预应力现浇板的张拉工艺及张拉时间的控制,同时也介绍了灌浆时间、灌浆工艺和浆液配合比问题,使项目得以顺利施工。
This paper mainly introduces construction process for cast-in-situ prestressed board including tensioning process,control of tensioning time.At the same time,this paper introduces also the determination of grouting time,grouting technique and mix proportion,so that the project is constructed smoothly.