苏州1000kV特高压变电站500kV电气主接线方案技术经济分析 被引量:5

Technical and Economic Analysis of 500 kV Main Electrical Connection Scheme in Suzhou 1 000 kV UHV Substation
原文传递
导出
摘要 随着特高压电网的快速发展,特高压变电站的电气主接线对电网的安全可靠运行起着越来越重要的作用,因此选择合适的电气主接线是特高压变电站建设中的一个重要课题。结合苏州1000kV特高压变电站的特性分析了500kV电气主接线方案,对双母线接线和3/2接线进行了详细的技术经济比较,推荐苏州特高压变电站500kV主接线采用双母线接线。该接线不仅能够满足电网可靠性的要求,而且调度灵活、扩建方便、占地小、投资省。 With the rapid development of UHV power grid, the main electrical connection of UHV substation becomes more and more important to the safe and reliable operation of power grid. Therefore, the selection of suitable main electrical connection is a key work in the construction of UHV substations. According to the characteristics of Suzhou 1 000 kV UHV substation, he 500 kV main electrical connection scheme is analyzed in this paper. The techno-economic comparison between double-bus connection and two-thirds connection is carried out and the 500 kV main electrical connection of Suzhou UHV substation is suggested to adopt the double-bus connection, which not only could meet the requirements of the reliability of power grid, but also have some advantages of flexible scheduling, convenient expansion, small occupation of land and low investment.
出处 《电力建设》 2013年第4期43-46,共4页 Electric Power Construction
关键词 特高压变电站 电气主接线 可靠性 双母线接线 3 2接线 UHV substation main electrical connection reliability double-bus connection two-thirds connection
  • 相关文献

参考文献12

  • 1GB50697-20111000kV变电站设计规范[s].北京:中国计划出版社,2011.
  • 2李勇,黄宝莹,鲁宗相,宋福龙,易海琼,石改萍.基于电网协调发展的特高压变电站电气主接线设计原则[J].电力建设,2011,32(1):27-33. 被引量:9
  • 3国家电网公司.国家电网总体规划设计[R].北京:国家电网公司,2009.
  • 4中国电力工程顾问集团、国网北京经济技术研究院.淮南-南京-上海1000kV交流输变电工程可行性研究[R].北京:中国电力工程顾问集团、国网北京经济技术研究院,2010.
  • 5Billinton R, Chen H, Zhou J Q, Individual Generating Station Reliability Assessment [ J ], IEEE Transaction on Power System, 1999,14(12) :4.
  • 6Billinton R, Ronald N. Allan, Reliability Evaluation of Power System (second edition)[ M], Plenum Press, 1994.
  • 7Billinton R, Ronald N. Allan, Reliability Evaluation of Engineering System: Concepts and Techniques[M]. Pitman Press, 1983.
  • 8郭永基.苏联若干电工产品可靠性指标统计数据[J].电工技术杂志,1989(3):8-13. 被引量:1
  • 9CIGRE WG13.06. Studies on the Reliability of Single Pressure SF6- Gas High-voltage Circuit Breakers[ S]. 1996.
  • 10CAE. Forced Outage Performance of Transmission Equipment [S]. 1996.

二级参考文献8

  • 1利索夫斯基ГС,海菲茨M9.35-750千伏变电所主接线及电力设备[M].王栋令,张金城,吕全本,译.北京:电力工业出版社,1980.
  • 2Q/GDW294-20091000kV变电站设计技术规定(电气部分)[S].北京:国家电网公司,2009.
  • 3Lu Zongxiang, Guo Yongji. The Hierarchical reliability evaluation method of distribution system including substations structure[C]//. CIGRE International Conference on Power Systems/ICPS2001, Wuhan, China, 2001.
  • 4DL/T5218-2005220-500kV变电所设计技术规程[S].北京:中国电力出版社,2005.
  • 5国家电网公司.国家电网公司"十二五"电网发展规划总报告[R].北京:国家电网公司,2010.
  • 6国网北京经济技术研究院.交流特高压站电气主接线选择原则研究[R].北京:国网北京经济技术研究院,2010.
  • 7袁亚华,王自果.最小路集的邻接终点矩阵算法[J].西北工业大学学报,1989,7(4):473-478. 被引量:10
  • 8鲁宗相,郭永基.水电站电气主接线可靠性评估[J].电力系统自动化,2001,25(18):16-19. 被引量:52

共引文献78

同被引文献26

引证文献5

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部