摘要
凡口铅锌矿为了适应有色金属工业发展的需要 ,决定对主井提升系统实施技术改造 ,文章阐述了技改方案的选择以及为了达到技改目的所采取的措施。
Fankou Lead Zinc Mine decided to carry out technical reformation to the hoisting system of main shaft in order to suit the needs of the development of nonferrous metals industry.This paper described the selection of technical schemes and the adopted measures for achieving the goals of technical reformation.
出处
《矿业研究与开发》
CAS
2000年第4期24-25,共2页
Mining Research and Development
关键词
主井
提升机
双箕斗
技术改造
电控系统
Main shaft
Hoist
Twin skip
Technical reformation
Electric control system