浅谈36m轨排铺设法施工技术 被引量:3

Brief Introduction to 36m Panel Laying Methodology
在线阅读 下载PDF
导出
摘要 土耳其安卡拉至伊斯坦布尔高速铁路(以下简称安伊高铁)采用欧洲标准,选用意大利生产的36 m长定尺钢轨,采用现场闪光接触焊。为了减小铺轨基地建设规模,并且适应轨道工程作业面不连续的特点,按照36 m标准钢轨长度,选择轨排铺设法来实施轨道工程,并在现场焊接成无缝线路。36 m轨排铺设法不同于国内25 m轨排铺设法,由于采用了替轨,可以利用运轨小车将轨排直接运送至铺设位置,解决了单节轨排跨度大的难题。 Following the European Standard, 36 m rails produced in Italy are used with flash butt-welding method to create the continuous welded rails(CWR) in the future on site in Ankara-Istanbul High Speed Railway Project. To minimize the scale of the track laying base and avoid the risk of discontinuous track works flow, the 36 m panel laying methodology is adopted, which will be welded on site to achieve the CWR track. The 36 m panel laying methodology is different from the 25 m panel laying methodology used in China. With the help of the ramp rail, the panel can be directly transported to its due position by the caterpillar vehicle, by which the problem of huge span for single panel is solved.
作者 许铁生
出处 《铁道建筑技术》 2013年第3期23-25,28,共4页 Railway Construction Technology
关键词 高速铁路 欧州标准 轨排铺设法 替轨 high speed railway european standard panel laying methodology ramp rail
  • 相关文献

同被引文献28

引证文献3

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部