改进粒子群算法求解应急项目瓶颈资源动态调度问题 被引量:1

Improved PSO to dynamic scheduling problem of bottleneck in emergency
在线阅读 下载PDF
导出
摘要 应急项目中资源的调度受到多种随机因素影响,处于复杂动态的环境中,求解困难;约束理论指出瓶颈是复杂系统管理的核心,将调度的重点放在瓶颈资源上可以简化复杂系统问题。针对于此,研究了应急项目中瓶颈资源的动态调度问题,以达到提高资源的利用率、减轻损失等目的。首先,从优化目标、机器环境、作业特征和约束几方面分析并描述了应急项目中瓶颈资源调度的问题特征,建立了相应的数学模型;接着,运用混合重调度策略和改进粒子群算法进行算法设计,实现了瓶颈资源的动态调度;最后,通过仿真实验并对比了多种算法的结果,验证了该算法的可行性和有效性,证明其具有较好的理论和实际应用价值。 Emergency projects' optimal resource scheduling is in a complex and dynamic environment.It makes the problem-solving more difficult.Theory of constraints confirms that bottleneck determine the whole system's performance.Dynamic scheduling of the bottleneck can simplify the complex system problems.Thus,this paper studied the dynamic scheduling problem of bottleneck in emergency to improve the resource' utilization,and cut down the expense etc.Firstly,it analyzed the problem's characteristics from the aspects of the optimal goal,machine environment,processing characters and constraints,and built the mathematical model.Then,it used hybrid rescheduling strategy and improved particle swarm optimization to build an algorithm and realized the dynamic scheduling of the bottleneck resources.Finally,the case study demonstrates the algorithm's feasibility,effectiveness,the value of theory and the practical application.
出处 《计算机应用研究》 CSCD 北大核心 2013年第4期989-992,共4页 Application Research of Computers
基金 国家自然科学基金资助项目(71001005) 四川省"十二五"规划项目(SC11C042) 四川省教育厅科研资助项目(10ZC004)
关键词 应急项目 瓶颈资源 动态调度 粒子群算法 emergency projects bottleneck resources dynamic scheduling particle swarm optimization
  • 相关文献

参考文献15

  • 1OZDAMAR L, EKINCI E, KUCUKYAZICT B. Emergency logistics planning in natural disasters [ J]. Annals of Operation Research, 2004,329(1-4) :217-245.
  • 2ALTAY N, GREEN W G. OR/MS research in disaster operations management[ J]. European Journal of Operational Research, 2006,175( 1 ) :475-493.
  • 3LIANG Yan, BAO Jin-song, HU xiao-feng, et al. A heuristic project scheduling approach for quick response to maritime disaster rescue [J]. International Journal of Project Management, 2009,27 (6) :620-628.
  • 4GOLDRATr E M, COX J, WHITFORD D. The goal: a process of ongo- ing improvement [ M ]. Creat Barrington : North River Press, 1984.
  • 5BETTERTON C E, COX HI J F. Espoused drum-buffer-rope flow control in serial lines:a comparative study of simulation models[ J ].International Journal of Production Economics,2009,117 ( 1 ) : 66-79.
  • 6CHEN Chun-lung, CHEN Chuen-lung. A bottleneck-based heuristic for minimizing makespan in a flexible flow line with unrelated parallel machines [ J ]. Computers & Operations Research, 2009, 36 ( 11 ) :3073-3081.
  • 7VOLGENANT A, DUIN C W. Improved polynomial algorithms for ro- bust bottleneck problems with interval data [ J ]. Computers & Operations Research ,2010,37 ( 5 ) :909-915.
  • 8PINEDO M L. Scheduling : theory, algorithms, and systems [ M ]. 2nd ed. Upper Saddle River:Prentice Hall,2002.
  • 9RANJBAR M, De REYCK B, KIANFAR F. A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling [ J]. European Journal of Operational Research ,2009,193( 1 ) : 35-48.
  • 10杨琴,周国华,林晶晶,赵茜.应急事件中瓶颈环节的实时优化调度[J].系统工程,2010,28(7):74-78. 被引量:6

二级参考文献8

共引文献10

同被引文献20

  • 1韩强.一类应急物资调度的双层规划模型及其算法[J].中国管理科学,2007,15(z1):716-719. 被引量:15
  • 2张旭凤.应急物资分类体系及采购战略分析[J].中国市场,2007(32):110-111. 被引量:38
  • 3陈岳明,萧德云.应急系统调度方案的最优决策算法设计[C]// 中国控制与决策会议论文集.沈阳:东北大学出版社,2008:4671-4674.
  • 4BARBAROSNGLU G, LINET O, AHMET C. An interactive ap- proach for hierarchical analysis of helicopter logistics in disaster relief operations[ J]. European Journal of Operational Research,2004, 140(1 ) :118-133.
  • 5BARBAROSNGLU G, ARDA Y A. Two-stage stochastic programming framework for transportation planning in disaster response [ J ]. Jour- nal of Operational Research Society,2004,55( 1 ) :43-53.
  • 6WANG Sun-sheng, WANG Yan , SUN Jian, et. al. Selection of op- timal scheme for multiple disaster places emergency systems [ C ]// Proc of the 14th International Conference on Management Science & Engineering. 2007:523-528.
  • 7SHEU J B. Dynamic relief-demand management for emergency logis- tics operations under large-scale disasters [ J ]. Transportation Re- search Part E ,2010,46( 1 ) : 1-17.
  • 8YI Wei, OZDAMAR L. A dynamic logistics coordination model for evacuation and support in disaster response activities [ J ]. Journal of Operational Research ,2007,179 ( 3 ) : 1177-1193.
  • 9ALEXANDRA O, FLORIN P, CIPRIAN D, et al. A dynamic re- scheduling algorithm for resource management in large scale dependa- ble distributed systems[J]. Computers & Mathematics with Appli- cations ,2012,63 (9) : 1409-1423.
  • 10ZALMIYAB Z, SANJA P. Genetic algorithms for match--up resche- duling of the flexible manufacturing systems[ J]. Computers& Indus- lrial Engineering,2012,62(2) :670-686.

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部