摘要
针对隔河岩水电厂原同期装置软硬件系统技术相对落后和之后更新的同期装置存在的问题,2012年初又更换为科明CM-320B自准同期装置,介绍了该同期装置的特点及其基本工作原理。
Due to the technological backward of the hardware and software system of the original synchronizing device in Geheyan Hydropower Plant and some problems existing in the later updated device,the synchronizing device is superseded by Keming CM-302B automatic quasi-synchronizing device in 2012,whose characteristics and basic work principle are introduced.
出处
《水电与新能源》
2013年第2期39-40,60,共3页
Hydropower and New Energy
关键词
同期装置
控制流程
改造
synchronizing device
control process
improvement