期刊文献+

上海光源储存环恒流注入束流安全性模拟 被引量:2

Top-up safety simulation of injection beam for Shanghai Synchrotron Radiation Facility storage ring
在线阅读 下载PDF
导出
摘要 针对恒流注入过程中在同步辐射光闸开启情况下的辐射安全问题,对注入电子束轨迹进行了模拟跟踪计算,考察电子束在什么样的极端情况下会从光束线通道打出造成辐射安全事故。束流动力学模拟采用Accelerator Toolbox(AT)程序,正向跟踪电子轨迹。在不丢失任何可能性的前提下,放大入射电子束相空间,减小跟踪距离,简化计算。通过模拟结果得到机器安全联锁保护条件,为保障安全的恒流注入提供依据。 For the safety issue for top-up injection, the trajectory of the injection beam was tracked to find out in what kinds of conditions the injection beam would get through the synchrotron light beam pipe and cause radiation hazards. The forward tracking method is used with Accelerator Toolbox (AT) code. We enlarge injection beam phase space volume and reduce the beam line element to simplify the calculation while covering all the possibility. According to this simulation, the interlock criteria are set up for top-up operation.
出处 《强激光与粒子束》 EI CAS CSCD 北大核心 2013年第4期985-988,共4页 High Power Laser and Particle Beams
关键词 恒流注入 辐射安全 AT程序 上海光源 top-up radiation safety Accelerator Toolbox code Shanghai Synchrotron Radiation Facility
  • 相关文献

参考文献4

  • 1Ohkuma H. Top-up operation in light sourees[C]//Proceedings of EPAC08. 2008:36-40.
  • 2李原,李浩虎,刘桂民,李德明.上海光源增强器注入引出系统物理设计[J].核技术,2008,31(7):493-496. 被引量:2
  • 3Borland M, Emery L. Tracking studies of top-up safety for the Advanced Photon Source[C]//Proceedings of the 1999 Particle Accelerator Conference. 1999 : 2320-2322.
  • 4Terebilo A. Accelerator toolbox for Matlab[R]. SLAC-PUB-8732, 2001.

二级参考文献4

  • 1Xu H J, Zhao Z T. Nucl Sci Tech, 2008, 19:1-6
  • 2Geyer C H. Injection and Extraction of the BESSY Ⅱ Booster and Storage Ring, EPAC1994, 2349-2351
  • 3Campmany J, Traveria M. Injection and Extraction Schemes of the LSB Booster and Storage Ring
  • 4Terebilo A. Accelerator Toolbox for MATLAB, SLAC-PUB-8732, May 2001

共引文献1

同被引文献11

引证文献2

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部