青岛港董家口港区40万t矿石码头设计关键技术

Key technology of 400 000 DWT ore terminal of Dongjiakou port area in Qingdao port
在线阅读 下载PDF
导出
摘要 青岛港董家口港区是新开发的港区,矿石码头是我国第一个水工结构按靠~fi40TYt散货船设计的码头,工程波浪、水流条件复杂,工程量大,技术难度大,外海施工依托条件差。设计围绕选址、自然条件、平面布置、装卸工艺、水工结构、地基处理、节能环保等关键技术进行了研究,所取得的成果可供建设外海开敞式码头参考。 Dongjiakou port area of Qingdao port is a newly developed port area, and the marine structures of the ore terminal is the first 400 000 DWT bulk cargo berthing pier, which is characterized by complicated wave and flow conditions, large engineering volume, great technical difficulties, and unfavorable construction conditions. We carried out a study on key technologies concerning the site selection, natural conditions, plan layout, handling technology, hydraulic structures, foundation treatment, as well as energy saving and environment protection, and the results may serve as a reference for the construction of open-type terminals.
出处 《水运工程》 北大核心 2013年第A01期48-55,共8页 Port & Waterway Engineering
关键词 40万t矿石码头 设计 关键技术 400 000 DWT ore terminal design keg technology
  • 相关文献

参考文献10

  • 1交通运输部规划研究院,中交水运规划设计院有限公司.青岛港董家口港区详细规划[R].北京:交通运输部规划设计院,中交水运规划设计院有限公司,2010.
  • 2中交水运规划设计院有限公司.青岛港董家口港区青岛港集团矿石码头工程初步设计[R].北京:中交水运规划设计院有限公司,2011.
  • 3TJT295-2000开敞式码头设计与施工技术规程[S].
  • 4张志明,杨国平,文立,等.离岸深水港码头泊稳条件关键技术研究[R].北京:中交水运规划设计院有限公司,2010.
  • 5交通运输部天津水运工程科学研究所.青岛港董家口港区青岛港集团矿石码头工程船舶系泊物理模型试验研究报告[R].天津:交通运输部天津水运工程科学研究所,2010.
  • 6张志明,郑宝友,徐健,等.东北地区大型开敞式码头建设关键技术研究[R].北京:中交水运规划设计院有限公司,2008.
  • 7张志明,朱小松,周丰.波浪作用下大型开敞式圆沉箱墩式码头前波峰面高度研究[J].中国港湾建设,2011,31(3):20-26. 被引量:8
  • 8交通运输部天津水运工程科学研究所.青岛港董家口40万吨级矿石码头工程波浪整体物理模型试验研究报告[R].天津:交通运输部天津水运工程科学研究所,2009.
  • 9南京水利科学研究院.青岛港董家口港区青岛港集团矿石码头工程测流数模试验研究报告[R].南京:南京水利科学研究院,2009.
  • 10TJS167-2-2009重力式码头设计与施工规范[S].

二级参考文献3

  • 1中交水运规划设计院有限公司.东北地区大型开敞式码头建设关键技术研究[R].北京:中交水运规划设计院有限公司,2008.
  • 2JTJ295--2000,开敞式码头设计与施丁技术规程[s].
  • 3陈国平,张志明,严士常,邵杰.波浪作用下高桩码头前波峰面高度研究[J].水运工程,2010(1):28-31. 被引量:4

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部