摘要
结合具体工程对地铁盾构区间锚索障碍物处理施工实例,叙述了锚索障碍物处理的方案研究与选择,详细介绍了锚索障碍物处理的工艺过程与操作要点,探讨了锚索障碍物处理的关键技术与质量控制,对确保盾构顺利通过相关区间奠定了基础。
Combining the specific instance of processing for anchor cable obstacle in shield zone of subway, the method how to research and selection anchor cable obstacle processing solutions is described, the manufacturing process and operating points of it are introduced, and then, the key technologies and quality control are discussed. And the foundation that the shield can pass related interval smoothly is established.
出处
《福建建筑》
2013年第3期103-105,共3页
Fujian Architecture & Construction
关键词
地铁
盾构施工
全套管全回转钻机
锚索
障碍物
Subway
Shield construction
A full set Tube fill rotary rig
Anchor cable
Obstacles.