期刊文献+

巴基斯坦Darawat大坝工程水工模型实验研究 被引量:5

Experimental Research on the Hydraulic Model of the Darawat Dam in Pakistan
在线阅读 下载PDF
导出
摘要 基于巴基斯坦Darawat大坝的泄洪消能的水工模型实验,在不同工况下,观测溢流坝挑流跌流过程,并测量了溢流坝下游冲坑地形。分析实验数据,发现坝址左岸坡基岩出露,需对右岸岸坡进行防护。实验结果证明:增大宽尾墩的折角可实现对本方案的优化,设计方案布局合理。该结论为有效解决同类实际工程问题提供了一种新的方法。 A study is made based on the hydraulic model test of the Pakistani Darawat Dam under different test conditions. Observa- tion of the trajectory flow and overfall flow of the spillway and measurement of the scouring topography of the spillway downstream have been accomplished. It is found that bedrock on the left bank of dam site is exposed on the basis of the test data. It is necessary to take effective engineering measures to protect the right bank slopes. The test has proved that using the way of enlarging the bevel of flaring pier can optimize project design. The overall arrangement of the dam is rational. This conclusion serves as a scientific way to solve the practical problem of the same type of project.
出处 《中国农村水利水电》 北大核心 2013年第2期104-106,共3页 China Rural Water and Hydropower
关键词 巴基斯坦达瓦特大坝 水工模型实验 河床冲刷 优化方案 Pakistani Darawat Dam hydraulic experiment river bed scour optimal design
  • 相关文献

参考文献6

  • 1郭子中.消能防冲原理与水力设计[M].北京:科学出版社,1979.
  • 2华东水利学院.水工设计手册[M].北京:水利出版社,1980.
  • 3陈椿亭.高坝大流量泄水建筑物[M].北京:水利电力出版社,1988.
  • 4王宏硕 翁情达.水工建筑物[M].北京:水利水电出版社,1990.17-19.
  • 5潘家铮.水工建筑物设计丛书[M].北京:水利电力出版社,1992.
  • 6SL319-2005,混凝土重力坝设计规范[S].

共引文献144

同被引文献49

引证文献5

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部