摘要
介绍了三峡二期围堰防渗墙风化砂柔性材料施工配方中水泥、风化砂和水的检测原理、检测步骤和检测结果。通过以上检测 ,有效控制了三峡二期围堰防渗墙的施工质量。
The paper introduces the detection principles ,methods and results of cement,weathered sand and water in determination on job formulation used in the concrete cut off wall of TGP's second phase cofferdam.By detecting in situ the construction quality of phase Ⅱ cofferdam concrete cut off wall was effectively controlled.
出处
《长江科学院院报》
CSCD
北大核心
2000年第5期32-35,共4页
Journal of Changjiang River Scientific Research Institute
关键词
三峡工程
围堰
防渗墙
风化砂
塑性混凝土
Three Gorges Project(TGP)
cofferdam
cut off wall
weathered sand
flexible material