摘要 结合工程实例,通过对跨既有铁路、公路60 m钢箱梁拼装、运输、架设施工中,重大危险源的辨识、评价以及风险控制管理方法进行总结,阐述了安全生产管理体系及制度的建立和责任制落实等方面的管理经验,有利于同类工程的施工安全管理。 Combining with specific engineering example, the paper summarizes the major hazard source identification, evaluation and risk control management methods in the construction of crossing existing railway line, spelling 60 m highway box girder, transportation and erecting, and mainly describes the security production management system establishment and responsibility implementation and other management experience, which has certain referring meaning for similar engineering construction security management.
作者 康元忠
出处 《山西建筑》 2013年第7期165-166,共2页 Shanxi Architecture
关键词 既有线 架梁 重大危险源 辨识 控制 管理 existing railway line girder erecting major hazard source identification control management
  • 相关文献

参考文献2

二级参考文献4

  • 1武明霞.建筑安全技术与管理[M].北京:机械工业出版社,2007.
  • 2董大昊.建设施工安全生产中的危险源管理研究[D].上海:同济大学,2007.
  • 3《建设工程施工重大危险源辨识与监控技术规程》, 福建省建设厅,2007.11.
  • 4易高翔,于洋,魏利军,关磊.基于B/S模式的重大危险源安全管理信息系统[J].中国科技信息,2007(22):118-119. 被引量:5

共引文献7

同被引文献20

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部