达克曲克水电站溢洪道空化空蚀问题研究 被引量:5

Research on cavitation problem for spillway in ducky cheuck hydropower station
在线阅读 下载PDF
导出
摘要 国内首个成功运用通气减蚀措施避免泄水建筑物空蚀的工程是冯家山水库。与冯家山大坝一样,达克曲克水电站属中坝工程,最大坝高62.6m,有必要讨论表孔溢洪道泄槽空化空蚀问题。采用时启燧等提出的掺气挑坎临界坎高的经典算法以及空化空蚀相关规范,通过理论计算与实际分析表明:①在溢洪道泄槽段无需设置掺气挑坎;②在没有掺气减蚀措施的情况下,计算施工不平整度按要求控制可以有效避免空化空蚀。 Fengjiashan Reservoir is the first engineering by successfully using measures of cavitation control by aeration to avoid the cavitation damage of water release structuree in China.The same as Fengjiashan dam,Ducky Cheuck hydropower station is the medium-sized engineering whose maximum dam height is 62.6 meters,so it is necessary to discuss the problem of cavitation and cavitation damage of the spillway chute.Used the classic algorithm put forward by Shi Qisui to calculate the critical ridge height of aerated bucket and the specification of cavitation damag,through theoretical calculation and the practical analysis,it shows that ① it is unnecessary to set up aerated bucket on the chute of spillway;②by controlling the construction irregularity according to the specification can effectively avoid cavitation and cavitation damag although in the case of no measures of cavitation control by aeration.
作者 颜婷 刘韩生
出处 《水资源与水工程学报》 2012年第5期77-80,共4页 Journal of Water Resources and Water Engineering
关键词 空化空蚀 溢洪道 掺气挑坎 施工不平整度 cavitation erosion spillway aerated bucket construction irregularity
  • 相关文献

参考文献4

二级参考文献3

  • 1夏毓常,1984年
  • 2团体著者,1983年
  • 3团体著者,1981年

共引文献6

同被引文献54

引证文献5

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部