期刊文献+

2×300MW燃煤发电机组电除尘改造方案设计 被引量:3

Remoulding Scheme of Electro-precipitator on 2×300 MW Coal-fired Generating Units
在线阅读 下载PDF
导出
摘要 通过比较2×300 MW燃煤发电机组3种电除尘改造思路的可行性,综合考虑空间布置、运行的安全可靠性,确定采用袋式除尘技术加以改造。电除尘器改造为袋式除尘器的方案,包括主要设计参数选择、系统设计、改造工程费用与预期的环境效益。改造后,袋式除尘器运行安全、可靠,完全满足国家烟尘排放标准。 This article introduced the remoulding idea of electro-precipitator on 2×300 MW coalfired generating units,compared the feasibility of three remoulding schemes.Considering the spa tial arrangement and the safety and reliability of operation,it finally selected the baghouse tech nique.Also it elaborated the remoulding scheme of electro-precipitator to baghouse,including the choices of main designparameters,system design,the costs of renovation project and the expect ed environmental benefit.After remoulded to baghouse,the operation is safe,reliable and fully meet the national emission standards.
作者 卜春祥
出处 《中国环境管理干部学院学报》 CAS 2012年第5期68-71,共4页 Journal of Environmental Management College of China
关键词 燃煤电厂 电除尘器 改造 袋式除尘器 方案 coal-fired power plants electro-precipitator remoulding baghouse scheme
  • 相关文献

参考文献6

二级参考文献14

共引文献8

同被引文献23

引证文献3

二级引证文献41

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部