1C Y Lee,V J Leon. Machine Sheduling with a Rate-Modifying Ativity[J].European Journal of Operational Research,2001.119-128.
2C Y Lee,Z L Chen. Scheduling Jobs and Maintenance Activities on Parallel Machine[J].Naval Research Logistics,2000.145-165.
3G Mosheiov,J B Sidney. Scheduling a Deteriorating Maintenance Activity on a Single Machine[J].Journal of the Operational Research Society,2010.882-887.
5Lee C Y. Two-machine Flow Shop Scheduling with Availability Constrains[J].European Journal of Operational Research,1999,(02):420-429.doi:10.1016/S0377-2217(97)00452-9.
6M A Kubzin,V A Strusevich. Planning Machine Maintenance in Two-machine Shop Scheduling[J].Operations Research,2006.789-800.
3LINN R,ZHANG W.Hybrid flow shop scheduling:a survey[J].Computers and Industrial Engineering,1999,37(1-2):57-61.
4NAWAZ M,ENSCROE J E E,HAN I.A heuristic algorithm for the m-machine,n-job flow-shop sequencing problem[J].The International Journal of Management Science,1983,11(1):91-95.
5ALLAOUI H,ARTIBL A.Integrating simulation and optimization to scheduling a hybrid flow shop with maintenance constraints[J].Computers and Industrial Engineering,2004,47(4):431-450.
6THOMAS W S,GEORGE S.Combined production and maintenance scheduling for multiple-product,single machine production system[J].Production and Operations Management,2000,9(4):379-399.
7GAO J,GEN M,SUN L.Scheduling jobs and maintenances in flexible job shop with a hybrid genetic algorithm[J].Journal of Intelligent Manufacturing,2006,17(4):493-507.
8CASSADY C R,KUTANOGLU E.Minimizing job tardiness using integrated preventive maintenance planning and production scheduling[J].IIE Transactions,2003,35(6):503-513.
9AGGOUNE R.Minimizing the makespan for the flow shop scheduling problem with availability constraints[J].European Journal of Operational Research,2004,153(3):534-543.
10TAILAND E.Some efficient heuristic methods for the flow shop sequencing problems[J].European Journal of Operational Research,1990,47(3):65-74.
23assady C R, Kutanoglu E. Minimizing job tardiness using ntegrated preventive maintenance planning and production cheduling[J]. IIE Transactions, 2003,35 (6) 503-513.
3Hadidi L A, A1-Turki U M, Rahim A. Integrated models in production planning and scheduling,maintenance and quality., a review[J] International Journal of Industrial and Systems Engineering, 2012,10 (1) :21-50.
4Schmidt G. Scheduling with limited machine availability[J]. European Journal of Operational Research, 2000,121 (1) : 1-15.
5Ma Y, Chu C, Zuo C. A survey of scheduling with deterministic machine availability constraints [J]. Computers Industrial Engineering, 2010,58(2) : 199-211.
6Mosheiov G, Sarig A. Scheduling identical jobs and due-window on uniform machines [J]. European Journal of Operational Research, 2010,201(3) : 712-719.
7SortrakulN,NachtmannHL,Cassady C R. Genetic algorithms for integrated preventive maintenance planning and production scheduling for a single machine[J]. Computers in Industry, 2005,56(2)161-168.
8Wang S J, Liu M. A branch and bound algorithm for single- machine production scheduling integrated with preventive maintenance planning[J]. International Journal of Production Research, 2013,51 (3) : 847-868.
9Berrichi A, Yalaoui F, Amodeo L, et al. Bi-Objective Ant Colony Optimization approach to optimize production and maintenance scheduling [ J ]. Computers Operations Research, 2010,37 (9) : 1584-1596.
10Ruiz R,Garcia-Diaz J C, Maroto C. Considering scheduling and preventive maintenance in the flowshop sequencing problem [J] Computers Operations Research, 2007, 34 ( 11 ): 3314-3330.