摘要
针对珠江三角洲平原地形平坦、线路沿线地面建筑物、地下管线密集等问题,以广州地铁为例,阐述了地铁施工盾构隧道地表和地面建筑沉降监测措施及方案,并总结了监理过程中的若干经验,为类似工程提供了借鉴。
Accordign to some problems at Zhujiang Delta with plain topography,the buildings on ground along the route and the dense underground pipelines,the paper illustrates the settlement supervision measures and schemes of the surface and ground buildings of the subway shield tunnels,and sums up some experience during the supervision process,so as to provide some reference for similar projects.
出处
《山西建筑》
2013年第6期155-155,238,共2页
Shanxi Architecture
关键词
地铁
盾构
沉降
监测
subway
shield
settlement
supervision