摘要
根据宜昌山区的特点 ,如何在输电线路工程中大幅度降低工程造价 ,方便施工 ,缩短工期 ,其重要途径是精心设计 ,大胆、大量采用岩石基础。
In connection with the characteristics of Yichang mountain area,the key method to reduce the cost and time of transmission lines construction and to make the operation convenient is applying large number of rock foundations.According to the relevant section of electric power transmission design,the design idea and method for the rock foundation in Yichang district were explained.
出处
《湖北电力》
2000年第2期41-43,共3页
Hubei Electric Power
关键词
输电线路
岩石基础
施工
design
transmission lines
rock foundation