摘要
针对广州地铁2、8号线有线调度电话系统割接、拆解工程应用实例,详细介绍有线调度电话系统新旧设备的割接、调试验收、接管和实施拆分的具体方法,以及如何确保分拆中既有设备的稳定运行等。
In the case of the cutting and dismantling engineering application of the cable dispatching telephone system of Guangzhou Metro Line 2 and Line 8,the cutover between the old equipment and the new one,the debugging,acceptance,and takeover of the new system as well as some specific methods to implement such as splitting were elaborated.It was also summarized how to ensure the stable operation of the equipment in cutovering.
出处
《铁道通信信号》
2013年第1期82-84,共3页
Railway Signalling & Communication
关键词
城市轨道交通
有线调度电话系统
割接
拆分
Urban rail transit
Cable dispatching telephone system
Cutover
Splitting