4ZHA X F, DU H. A PDES/STEP-based model and system for concurrent integrated design and assembly planning [J]. Com- puter-Aided Design,2002,34(14) : 1087- 1110.
5BOWLAND N W, GAO J X,SHARMA R. A PDM-and CAD- integrated assembly-modeling environment for manufacturing planning [J]. Journal of Materials Processing Technology, 2003,138(1/2/3) :82 -88.
6DEVIPRASAD T, KESAVADAS T. Virtual prototyping of as- sembly components using process modeling [J]. Journal of Manufacturing Systems, 2003,22 (1) : 16-27.
7BLEY H, FRANKE C. Integration of product design and as sembly pPlanning in the digital factory [J]. CIRP Annals- Manufacturing Technology, 2004,53 ( 1 ) : 25-30.
8LOHSE N, HIRANI H, RATCHEV R, et al. An ontology for the definition and validation of assembly processes for evolvable assembly systems[EB/OL]. [2011-04-08]. http:// ieeexplore, ieee. org/ie15/10101/32361/01511480, pdf.
9DONG Liang, LI Yuan, YU Jianfeng, et ai. A cooperative method between assembly process planning and simulation for complex product[C]//Proceedings of the 2009 International Conference on Interoperability for Enterprise Software and Applicatoins China. Washington, D.C. ,USA:IEEE C~mput- er Society, 2009 : 163-166.