摘要 隧道进口施工一直是困扰大型隧道施工的技术难题,在偏压地段更是如此,结合张家口至石家庄高速公路北口隧道进口段工程,针对工程开挖后初期支护和坡体产生裂缝这一隧道进口段代表性工程问题展开了专项研究。采用理论分析与监测试验相结合的研究方法,在全面研究偏压隧道进口段工程裂缝发生机理的基础上,提出了非均匀支护控制措施,并通过控制效果监测数据的稳定性评价验证了机理和措施的合理性。研究结果表明:基于围岩压力和隧道开挖后松动圈、塑性区及变形计算理论,通过支护结构特征曲线与围岩支护需求曲线相结合,分析了北口隧道进口段初期支护和坡体裂缝发生机理;在裂缝发生机理研究的基础上,基于支护结构刚度思想确定了非均匀支护参数。 Tunnel entrance construction has been a technical problem puzzled large-scale tunnel construction, especially in bias sections. A special research on the typical problem of the crack of initial supporting and slope after engineering excavating is conducted combining with the Beikou tunnel entrance project of Zhangjiakou-Shijiazhuang expressway in Hebei Province. Based on the comprehensive study of crack occurrence and development mechanism of bias tunnel entrance engineering, with the methods of theoretical analysis and monitoring test, non-uniform support and control measures are proposed, and the rationality of the mechanism and control measures is verified through the stability evaluation of control effect monitoring data. The results show that : ( 1 ) with the methods of surrounding rock pressure, broken-rock circle, plastic zone and deformation theories when the tunnel excavated, through combining support structure characteristics curve with wall rock support demand curve, the primary support and slope crack occurrence mechanism in the Beikou tunnel entrance are proposed; (2) based on the study of crack occurrence mechanism, non-uniform support parameters are defined using supporting structure stiffness thought.
出处 《公路交通科技》 CAS CSCD 北大核心 2013年第2期69-76,共8页 Journal of Highway and Transportation Research and Development
基金 国家高技术研究发展计划(八六三计划)项目(2009AA11Z105) 河北省科技支撑计划项目(11276716D)
关键词 隧道工程 进口施工 发生机理 控制机理 坡体裂缝 tunnel engineering tunnel entrance construction occurrence mechanism control mechanism slope crack
  • 相关文献

参考文献18

  • 1LACKNER R,MANG H A. Cracking in Shotcrete Tunnel Shells[J].Engineering Fracture Mechanics,2003,(7/8):1047-1068.doi:10.1016/S0013-7944(02)00165-0.
  • 2PARK K H,TONTAVANICH B,LEE J G,PARK K H,TONTAVANICH B,LEE J G. A Simple Procedure for Ground Response Curve of Circular Tunnel in Elastic-strain Softening Rock Masses[J].Tunnelling and Underground Space Technology,2008,(02):151-159.doi:10.1016/j.tust.2007.03.002.
  • 3邬洪波,周荣贵,廖军洪,王芳.高速公路隧道进口段的安全评价技术[J].公路交通科技,2012,29(10):126-132. 被引量:11
  • 4张希黔,周敬,葛勇,严春风,黄宾.基于数值计算的楔形体稳定性分析方法研究[J].公路交通科技,2010,27(11):1-7. 被引量:7
  • 5DAY M J. Karstic Problems in the Construction of Milwaukee's Deep Tunnels[J].Environmental Geology,2003,(06):859-863.
  • 6汪宏,蒋超.浅埋偏压隧道洞口坍方数值分析与处治[J].岩土力学,2009,30(11):3481-3485. 被引量:50
  • 7杨小礼,黄波,王作伟.水平地震力作用下浅埋偏压隧道松动围岩压力的研究[J].中南大学学报(自然科学版),2010,41(3):1090-1095. 被引量:22
  • 8HASHASH Y,HOOK J,SCHMIDT B. Seismic Design and Analysis of Underground Structures[J].Tunnelling and Underground Space Technology,2001,(01):247-293.
  • 9YASHIRO K,KOJIMA Y,SHIMIZU M,YASHIRO K,KOJIMA Y,SHIMIZU M. Historical Earthquake Damage to Tunnels in Japan and Case Studies of Railway Tunnels in the 2004 Niigataken-Chnetsu Earthquake[J].Quarterly Report of Railway Technical Research Institute,2007,(03):136-141.
  • 10SANCHEZ-MERINO A L,FERNANDEZ-SAEZ J,NAVARRO C,SANCHEZ-MERINO A L,FERNANDEZ-SAEZ J,NAVARRO C. Simphfied Longitudinal Seismic Response of Tunnels Linings Subjected to Surface Waves[J].Soil Dynamics and Earthquake Engineering,2009,(03):579-582.doi:10.1016/j.soildyn.2008.06.003.

二级参考文献95

共引文献335

同被引文献33

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部