期刊文献+

大型项目BIM模型组织方法与实践 被引量:25

Methods of Manage the Large Project BIM Model
在线阅读 下载PDF
导出
摘要 大型项目BIM模型量大,需要有严格和有效的管理方法,才能确保BIM模型满足多专业、多人员可以有条不紊地协同工作,并遵循标准和规则确保模型的精度满足项目应用要求,同时最小化建模的成本。除了通过传统的校审流程,还应利用软件工具检查BIM模型,以保障模型的质量以及采取相应的措施保障数据的安全。 Large project BIM model amount is large, which require rigorous and effective management meth- ods, to ensure that the BIM model satisfies architects, structure engineers, MEP engineers can work together every- thing in good order and well arranged, and follow the standards and rules to ensure that the model accuracy can meet the application requirement of the project, while minimizing the cost. Apart from the traditional review process, also should use software tools to check the BIM model, in order to ensure the quality of models and adopt corresponding measures to ensure data security.
作者 何波
出处 《土木建筑工程信息技术》 2012年第4期7-14,共8页 Journal of Information Technology in Civil Engineering and Architecture
关键词 BIM 建筑信息模型 BIM标准 BIM Building Information Modeling BIM Standard
  • 相关文献

参考文献3

  • 1Los Angeles Community College District.《Building Infor-mation Modeling Standards》[]..
  • 2Hong Kong Housing Authority.《Building Information Mod-elling (BIM)Standards Manual》[]..
  • 3Chuck Eastman,Paul Teicholz,Rafael Sacks,Kathleen Lis-ton.《BIM Handbook》[]..

同被引文献153

引证文献25

二级引证文献269

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部