分析了小龙谭电厂冲渣水回收系统改造前系统不合理的原因及渣水水质特点 ,详细介绍了改造成闭式循环后的回收工艺 ,并作了简要的经济分析。
The retrofitting process of a closed circuit bottom ash sluicing system is detailed presented The water quality of bottom ash sluicing,the unreasonable causes for the old system as well as the economic results of the bottom ash water treatment are analyzed
出处
《电力环境保护》
2000年第3期29-30,共2页
Electric Power Environmental Protection
关键词
废水处理
冲渣水
发电厂
改造
闭式循环系统
wastewater treatment
bottom ash-sluicing water
closed circulation