期刊文献+

某水电站坝基扬压力异常原因分析 被引量:6

Causal analysis on abnormity of uplift pressure of a dam
在线阅读 下载PDF
导出
摘要 坝基扬压力监控在重力坝安全监控中占有十分重要的地位,通过对某水电站坝基扬压力监测资料的定性分析发现,5号坝段坝基扬压力测值偏高,并有逐渐增加的趋势。进而通过扬压力折减系数、简单相关系数法、统计模型法、综合成因分析法等方法对该坝段进行定量分析,发现该坝段测孔扬压力折减系数偏大,测孔水位与上游水位相关性较大,进一步证明5号坝段下游侧可能存在潜在渗流通道,应加强监测,并在必要时采取工程措施。 The monitoring of uplift pressure in dam foundation is an important measure to ensure the safety operation of a dam. Based on the qualitative analysis of the observed hydraulic uplift pressure of a dam foundation, we find the hydraulic uplift pressure in the No. 5 dam block is high and has a further upward tendency. The high uplift pressure in the dam block is analyzed by uplift pressure reduction coefficient method, simple correlation method, statistical model method and comprehensive analytical method. The results reveal that the uplift pressure reduction coefficient and the correlation between the water level in monitoring hole and the water level of reservoir is higher, which indicates that a potential bidden seepage pass exists in its foundation, so the monitoring work should be strengthened.
出处 《人民长江》 北大核心 2013年第1期52-56,共5页 Yangtze River
基金 国家自然科学基金资助项目(51139001 51179066 51079046 50909041) 新世纪优秀人才支持计划资助(NCET-11-0628 NCET-10-0359) 河海大学水文水资源与水利工程科学国家重点实验室专项基金(2009586012 2009586912 2010585212)
关键词 扬压力 定性分析 定量分析 统计模型 坝基中图法 uplift pressure qualitative analysis quantitative analysis statistical model dam foundation
  • 相关文献

参考文献4

二级参考文献9

共引文献25

同被引文献23

引证文献6

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部