期刊文献+

任务负载竞争下制造资源配置的非合作博弈方法 被引量:2

Non-cooperative Game for Manufacturing Resources Configuration Driven by Job Load Competition
在线阅读 下载PDF
导出
摘要 在制造资源配置过程中,针对不同生产设备为了追求任务负载而存在的自由竞争关系,引入博弈论描述设备之间在任务负载上的相互制约关系。提出基于非合作博弈的制造资源优化配置方法,把生产设备映射为非合作博弈制造资源优化配置模型的局中人,建立局中人的策略及其收益函数。利用模糊聚类分析的方法对博弈局中人进行聚类,进行Nash均衡的求解。通过实例与遗传算法、禁忌搜索、粒子群算法进行比较,结果表明基于非合作博弈的制造资源优化配置方法获得的任务负载策略能够保证生产设备总体具有更高的利用率,由此,验证了算法的有效性和正确性。 Manufacturing resources configuration is to load the manufacturing processes onto relevant equipment,and the equipment to accomplish the manufacturing job within certain working time, human and cost. There are free competition relationships between equipment and manufacturing duties in the configuration processes. The game theory was introduced to describe their restrictive relation. Then an optimization method on manufacturing resources configuration based on non--cooperative game was proposed. The equipment was regarded as player, while player's strategy and payoff were built. And by fuzzy cluster analysis the players were clustered to solve Nash equilibrium. Finally, an example was given by compared with GA, PSO and Tabu search. The results show that task load strategy obtained by the proposed algorithm can guarantee the overall equipment utilization is higher. Therefore, the effectiveness and correctness of algorithms herein were proved.
出处 《中国机械工程》 EI CAS CSCD 北大核心 2013年第2期233-239,共7页 China Mechanical Engineering
基金 国家高技术研究发展计划(863计划)资助项目(2009AA04Z122) 国家科技支撑计划资助项目(2012BAF10B09)
关键词 任务负载 制造资源配置 非合作博弈 纳什均衡 job load manufacturing resources configuration non-- cooperative game Nash equilibrium
  • 相关文献

参考文献11

二级参考文献60

  • 1谢能刚,方浩,包家,汉赵雷.博弈决策分析在补偿滑轮组变幅机构多目标设计中的应用[J].机械强度,2005,27(2):202-206. 被引量:21
  • 2花广如,王会凤,张震寰,周雄辉,阮雪榆.基于遗传算法的加工方案选择与操作排序综合优化方法[J].上海交通大学学报,2006,40(2):195-200. 被引量:8
  • 3玄光男 程润伟.遗传算法与工程设计[M].北京:科学出版社,2000..
  • 4Gaafar L K, Masoud S A. Genetic Algorithm and Simulated Annealing for Scheduling in Agile Manufacturing[J]. International Journal of Production Research, 2005,43 (14) : 3069-3085.
  • 5Thiagarajan S,Rajendran C. Scheduling in Dynamic Assembly Job-shops with Jobs Having Different Holding and Tardiness Costs [J]. International Journal of Production Research, 2003, 41 ( 18 ) : 4453-4486.
  • 6Thiagarajan S,Rajendran C. Scheduling in Dynamic Assembly Jobshops to Minimize the Sum of Weighted Earliness, Weighted Tardiness and Weighted Flowtime of Jobs[J]. Computers and Industrial Engineering, 2005,49 (4) : 463-503.
  • 7Lee C Y,Cheng T C E,Lin B M T. Minimizing the Makespan in the 3- Machine Assembly- type Flowshop Scheduling Problem [J]. Management Science, 1993,39 (5) : 616-625.
  • 8Potts C N,Sevast'janov S V,Strusevich V A,et al. The Two stage Assembly Scheduling Problem: Complexity and Approximation[J]. Operations Research,1995,43(2) :346-355.
  • 9Hariri A M A,Potts C N. A Branch and Bound Algorithm for the Two-stage Assembly Scheduling Problem[J]. European Journal of Operational Research, 1997,103(3): 547-556.
  • 10Cheng T C E, Wang G. Scheduling the Fabrication and Assembly of Components in a Two-machine Flow Shop[J] IIE Transactions, 1999,31 (2) : 135- 143.

共引文献107

同被引文献19

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部