摘要 垂直顶升法施工在电厂取排水隧道工程中已应用的相当广泛。电厂取排水工程采用的盾构法隧道内径一般Φ4000 mm左右,现在最大内径已经做到Φ6200 mm。每根盾构法隧道头部根据工程需要设置多个取排水立管,采用垂直顶升法施工。对垂直顶升法施工工艺做了较为详细地介绍,为今后类似工程提供借鉴。 The Vertical liiting method in the power plant water supply and drainage tunnel engineering is widely used. In the power plant water supply and drainage tunnel engineering, the inner diameter of the tunnel is about 4000mm, and the maximum inner diameter is about 6200mm. The number of vertical intake pipe on every intake tunnel is based on the engineer. They are constructed by using vertical lifting method. The article gives us a detailed presentation on the construction technology of the vertical lifting method in the engineering. And it will provide a useful reference for the similar proiects.
机构地区 华东电力设计院
出处 《电力勘测设计》 2012年第6期47-51,69,共6页 Electric Power Survey & Design
关键词 电厂 取排水隧道 垂直顶升法 施工 power plant water supply and drainage tunnel engineering the vertical lifting method
  • 相关文献

参考文献8

二级参考文献4

  • 1董胜宪.盾构法施工在电厂取排水工程中的应用[J].电力勘测设计,2004,16(4):47-50. 被引量:3
  • 2DL/T5339-2006,火力发电厂水工设计规范[S].北京:中国电力出版社.2006.
  • 3GB50446-2008盾构法隧道施工与验收规范[S].北京:中国建筑工业出版社,2008.
  • 4华东电力设计院.三门核电一期工程海水取、排水工程初步设计说明书[R].上海:华东电力设计院,2008.

共引文献248

同被引文献119

引证文献13

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部