蜀河水电站是汉江上游干流上第1个安装贯流式机组的水利枢纽工程。该机型安装、检修难度较大,结合对东方电机厂制造的灯泡贯流式机组各大部件的结构,对安装工艺进行叙述,有利于对灯泡贯流式机组结构的认识,提高检修维护的工艺。
Shuhe Hydropower Station is the first one which utilizes the bulb tubular units on the main stream of the Hanjiang River. It is difficulty in installation and repair of this type of the units. In combination with structures of large parts of the bulb tubular units manufactured by DEC, technology on installation is described so as to learn structure of the unit and improve skills of repair and maintenance.
出处
《西北水电》
2012年第6期72-76,共5页
Northwest Hydropower
关键词
贯流式机组
结构
安装
工艺
tubular unit
structure
installation
technology