摘要
蜀河水电站在一期围堰施工中对围堰结构、施工时段以及截流方案进行优化,汛期进行围堰施工准备,提前截流,为后续工程施工赢得了宝贵的时间。
In Phase I cofferdam construction, cofferdam structure, construction time and river-closure scheme of ShuheHydropower Station are optimized so that in flood period, cofferdam construction could be prepared and river closure can be executed ahead. These optimizations allow the sequent construction of the station with sufficient time.
出处
《西北水电》
2012年第6期59-61,共3页
Northwest Hydropower
关键词
蜀河水电站
一期围堰
截流
施工组织
Shuhe Hydropower Station
Phase I cofferdam
river closure