期刊文献+

MBBR工艺用于青岛李村河污水处理厂升级改造 被引量:31

Application of MBBR Process in Upgrading and Reconstruction of Licunhe WWTP in Qingdao City
原文传递
导出
摘要 青岛市李村河污水处理厂的升级改造工程规模为17×104m3/d,在综合分析污水厂现有工艺、占地、进出水指标及运行情况的基础上,升级改造的生物处理工艺采用投加悬浮填料工艺(MBBR工艺),实施改造后出水水质稳定达到《城镇污水处理厂污染物排放标准》(GB 18918—2002)的一级A标准。 The design capacity of the upgrading and reconstruction project of Licunhe WWTP, Qingdao City was 17 x 10^4 m3/d. Based on the comprehensive analysis of the existing process, occupa tion space, influent and effluent indexes and operation situation of the WWTP, the MBBR process was designed to be used in the upgrading and reconstruction project. After the reconstruction, the effluent quality met the first level A criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant ( GB 18918 2002).
出处 《中国给水排水》 CAS CSCD 北大核心 2013年第2期59-61,共3页 China Water & Wastewater
关键词 污水处理厂 升级改造 MBBR wastewater treatment plant upgrading and reconstruction Moving Bed BiofilmReactor (MBBR)
  • 相关文献

参考文献1

二级参考文献1

共引文献79

同被引文献187

引证文献31

二级引证文献245

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部