期刊文献+

锚杆锚固段合理设计长度分析 被引量:13

Bond length prediction of fully-grouted cable bolts in rock
在线阅读 下载PDF
导出
摘要 锚杆 (索 )加固方案设计的一个重要方面就是锚杆长度的合理选取 ,它的选取应该既保证经济 ,有足够的安全度 ,又不至于过长 ,从而增大锚索 (杆 )的长度 ,造成不必要的浪费 .基于此 ,本文根据锚杆破坏受力情况分析 ,提出锚杆锚固段合理设计长度 . How to decide the reasonable bond length of grouted bolts in rock is the primary element in structural reinforcement design.Safety and economy is the basic requirements.The paper presents favor bolt length in rock using models of elasticity properties,brittle cracking of grout and safe consideration and also shows that geometry of borehole and bolt are all relevant parameters in the development of the bolt grout interface pressure which result in bond strength increasing.
出处 《重庆交通学院学报》 2000年第3期94-97,108,共5页 Journal of Chongqing Jiaotong University
关键词 锚杆 锚索 锚固段设计长度 锚杆受力分析 bolt cable bond length
  • 相关文献

参考文献5

  • 1 周承芳,朴龙泽,李正国,等.岩土锚固工程技术[M].北京:人民交通出版社,1996.
  • 2 STILLBORG B.Experimental investigation of steel cables for rock reinforcement inhard rock[D].Doctoral Thesis,33D,Lulea University,Sweden,1984.
  • 3孙耀祖.新型岩石锚杆试验研究报告[R].成都:四川省公路规划勘察设计院,1993..
  • 4 KAISER P K,YAZICI S,NOSE J.Effect of stress change on the bond and strength offull grouted cables[J].Int.J.Rock Mech.Min.Sci.& Geomech.Abstr,1992,29:293-305.
  • 5 DUNCAN C.Wyllie,Fondations On Rock[M].E & FN Spon.Chapman & Harl 2-6Dourdary row London,SE18HN,1992.

共引文献1

同被引文献91

引证文献13

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部