摘要 针对某铁矿二期工程采矿范围内的水文地质条件和矿井充水因素及以往报告中该铁矿二期工程采矿范围内的矿坑涌水量预测值进行了分析,基于该矿一期工程帷幕注浆的堵水率和解析法分别预测了该铁矿二期工程实施帷幕注浆工程以后的矿坑涌水量。综合预测结果为:二期帷幕工程以后的正常矿坑涌水量为20093 m3/d,二期帷幕工程以后最大矿坑涌水量为31212.7 m3/d。根据预测结果和矿山实际情况,提出了一些建议。 This paper analyzes the hydro - geological conditions, water filling factors and the predicted mine water inflow values given in the past reports within the mining area in the second phase mining of some iron mine. Based on the water shutoff rate of curtain grouting in the first phase mining and analytic method, the mine water inflow in the second phase mining after imple- menting curtain grouting is predicted. The comprehensive prediction result is that the normal mine water inflow is 20093 m^3/d, maximum mine water inflow is 31212. 7 m^3/d in the second phase mining of the iron mine after curtain grouting. Finally, according to the predicted results and actual conditions of the mine, some suggestions are put forward.
出处 《矿业研究与开发》 CAS 北大核心 2012年第6期101-104,109,共5页 Mining Research and Development
关键词 矿坑涌水量 帷幕注浆 堵水率 解析法 Mine water inflow, Curtain grouting, Water shutoff rate, Analytic method
  • 相关文献

参考文献8

二级参考文献31

  • 1陈南祥,曹连海,李梅,黄强.偏最小二乘回归神经网络的矿坑涌水量预测[J].吉林大学学报(地球科学版),2005,35(6):766-770. 被引量:11
  • 2黄卓广,黄钟焕,黄梅新.比拟法在矿区矿坑涌水量预测应用实例[J].西部探矿工程,2006,18(3):93-94. 被引量:16
  • 3姚锦梅,周训,李娟,戴文育,康星洪.广东雷州半岛玄武岩地下水水文地球化学特征及演化模拟[J].地质通报,2007,26(3):327-334. 被引量:18
  • 4王军,陈勤树.复杂及特殊条件下矿床开采调研报告[R].长沙:中国有色金属工业采矿信息网,1995,10.
  • 5辛小毛,王军,黄炳仁.业庄铁矿井下帷幕注浆可行性论证报告[R].2002,2.
  • 6苏时才,魏克敏,等.宝鼎煤矿接替资源详查报告[R].四川攀枝花:四川煤炭产业集团攀枝花煤业公司,2009.
  • 7薛禹群,朱学愚编著.地下水动力学[M].北京:地质出版社,1981.
  • 8矿区水文地质工程地质勘探规范[S].国家技术监督局,1991,2.
  • 9房佩贤 卫中鼎 廖资生 等.专门水文地质学[M].北京:地质出版社,1987..
  • 10地质矿产部水文地质工程地质技术方法研究队.水文地质手册[M].北京:地质出版社,1985..