摘要
本文介绍了上海市轨道交通明珠线跨沪宁、沪杭铁路钢梁桥的施工情况 。
The paper introduces the steel girder bridge construction for striding Hu Ning and Hu Hang railways on the UMT Pearl Line in Shanghai,especially introduces the difficult parts,the construction of the bored pile adjacent to the railway and the suspension installation of the steel girder for striding the four lined railway in detail.
出处
《铁道工程学报》
EI
2000年第1期37-44,共8页
Journal of Railway Engineering Society
关键词
钻孔桩
吊装
施工
铁路桥
钢梁桥
urban mass transit(UMT)
Shanghai UMT Pearl Line
bored pile
steel girder
suspension installation